December Update






In the bathroom shot you can see the tiling with the boarder over which Sally has suffered so much. Tiling in the shower itself will continue above this level and the floor tiles which are green have yet to be laid.
We have two septic tanks, the one shown is closest to completion with the top probably being poured today. The purification system will then be installed.
The one shot from inside the bedroom shows the sliding windows already installed. Work on this in other rooms is ongoing. Eventually these will also have mosquito netting on the outside.
The shots of the outsides of the buildings show some sliding doors and windows already installed and hopefully gives some idea of what it will all look like when the sheeting is finally removed.